For decades, industrial development followed a familiar formula: find land zoned correctly, near an interstate interchange, and the project had a solid foundation. But the playbook has changed. Today, energy security has become just as critical to tenants as highway access—and in many cases, it’s the factor that decides whether a project moves forward.
Our leadership team has spent years in logistics and industrial development. We know firsthand that proximity to infrastructure is only part of the equation. Increasingly, power availability and timing are the new choke points. A parcel may check every box on access and zoning, yet without adequate or timely power, it simply isn’t developable.
This challenge is magnified when factoring in fleet electrification, something many developments fail to fully consider. Tenants transitioning to electric trucks, forklifts, and delivery fleets require far more power than traditional industrial service levels. That’s why PowerStack offers completely standalone fleet charging systems—solutions that can be deployed without waiting for the utility, keeping projects and tenants on schedule.
Beyond that, PowerStack also provides a pathway for expanding capacity beyond the basic service. As tenants grow or exceed their original power allocation, we can deliver additional generation and storage to match their needs—ensuring energy never becomes a barrier to occupancy or growth.
By integrating onsite generation, storage, and advanced controls, PowerStack delivers speed to power—bridging the gap between tenant demand and utility timelines. For industrial real estate, energy has become the new location factor. And with PowerStack, developers and tenants can treat it not as a risk—but as an opportunity to gain a competitive edge.